3674
Features
Foundation of Central Tower
  • Foundation of Central Tower - Pile Raft Foundation
  • Pile depth = 48 m
  • Raft = 2.5 m
  • Concrete Piles = 260 no.
  • Concrete Qty (Raft + Piling) = 18900 Cum
  • Grade of Concrete = M50
Green Features
  • Best practices are adopted during construction
  • Rain water harvesting
  • Construction waste recycled or reused
  • Efficient water fixtures in toilets & bathrooms
  • Recycling of waste water generated from toilets and kitchen
  • Reusage of recycled water for landscape & air conditioning
  • CFC/HCFC/HVAC equipment free to prevent ozone depletion
  • Construction materials with high recycled content and locally manufactured material
  • Designated space for the storage & collection of recyclable waste materials
  • Mivan Shuttering is used for construction
© 2017 All Right Reserved With Supertech Limited   |   E-mail us at northeye@supertechlimited.com or Call us at 9250933322